{"id":33443,"date":"2019-07-23T11:10:56","date_gmt":"2019-07-23T10:10:56","guid":{"rendered":"https:\/\/nationalwire.com.ng\/?p=33443"},"modified":"2019-07-23T11:10:56","modified_gmt":"2019-07-23T10:10:56","slug":"nigeria-siemens-sign-25000mw-six-year-electricity-deal","status":"publish","type":"post","link":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/","title":{"rendered":"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal"},"content":{"rendered":"<p>Nigeria and electricity giant, Siemens, have signed a power deal that will lead to the production of 25,000 megawatts of electricity by 2025.<\/p>\n<p>President Muhammadu Buhari gave the indication at the Presidential Villa on Monday during a meeting with the Siemens\u2019s Global Chief Executive Officer, Mr Joe Kaeser.<\/p>\n<p>He asked Siemens, the Transmission Company of Nigeria and the regulator to work hard to achieve 7,000mw and 11,000MW of reliable power supply by 2021 and 2023 in the first and second phases of the deal, respectively.<\/p>\n<p>By 2025 when the contract will lapse, a total of 25,000MW is expected to have been met.<\/p>\n<p>The deal came out of the August 31, 2018 meeting between the Nigerian President and the German Chancellor, Angela Merkel, in Abuja.<\/p>\n<p>Buhari said on Monday, \u201cWe all know how critical electricity is to the development of any community or indeed any nation. \u201cAnd in Nigeria, while we are blessed to have significant natural gas, hydro and solar resources for power generation, we are still on the journey to achieving reliable, affordable and quality electricity supply necessary for economic growth, industrialisation and poverty alleviation.<\/p>\n<p>\u201cThere have been many attempts at solving the electricity problem in our country. Previous governments have explored state-funded solutions through the ill-prepared National Independent Power Projects. They also explored the installation of large emergency power projects. There was also the partial privatisation of the power generation and distribution sectors.<\/p>\n<p>\u201cThese various interventions to solving the electricity problem have yielded an imbalance between the amount of power generated and the amount available for consumers. Despite over 13,000MW of power generation capacity, only an average of 4,000MW reliably reaches consumers. Now, we have an excellent opportunity to address this challenge.\u201d<\/p>\n<p>The President recalled that his administration\u2019s priority was to stabilise the power generation and gas supply sectors through the Payment Assurance Facility, which led to a peak power supply of 5,222MW.<\/p>\n<p>He, however, lamented that the transmission and distribution systems had remained major constraints.<\/p><div data-ad-id=\"32665\" style=\"text-align:center; margin-top:0px; margin-bottom:0px; margin-left:0px; margin-right:0px;float:none;\" class=\"afw afw_ad_image afw_ad afwadid-32665  \">\r\n                                                            <div style=\"font-size:10px;text-align:center;color:#cccccc;\">Advertisement<\/div>\r\n\t\t\t\t\t\t\t<a target=\"_blank\" href=\"http:\/\/www.accessbankplc.com\" rel=\"nofollow\"><img decoding=\"async\" height=\"auto\" max-width=\"100%\" src=\"https:\/\/nationalwire.com.ng\/wp-content\/uploads\/2019\/06\/Banner-1.jpg\"><\/a>\r\n                                                                        \r\n\t\t\t\t\t\t\t<\/div>\n<p>He said, \u201cThis is why I directed my team to ask Siemens and our Nigerian stakeholders to first focus on fixing the transmission and distribution infrastructure, especially around economic centres where jobs are created.<\/p>\n<p>While it was evident that more (work) needed to be done to upgrade the sub-transmission and distribution system, our government was initially reluctant to intervene as the distribution sector is already privatised.<\/p>\n<p>\u201cI am therefore very pleased with the positive feedback from private sector owners of the distribution companies, who have all endorsed government\u2019s intervention to engage Siemens on this end-to-end plan to modernise the electricity grid.\u201d<\/p>\n<p>The President also said, \u201cOur goal is simply to deliver electricity to Nigerian businesses and homes. My challenge to Siemens, our partner investors in the distribution companies, the TCN and the electricity regulator is to work hard to achieve 7,000MW of reliable power supply by 2021 and 11,000mw by 2023 \u2013 in phases one and two, respectively.<\/p>\n<p>\u201cAfter these transmission and distribution system bottlenecks have been fixed, we will seek in the third and final phase to drive generation capacity and overall grid capacity to 25,000MW.\u201d<\/p>\n<p>On his part, Kaeser recalled that a Letter of Agreement on the Nigerian Electrification Road map was submitted to the Nigerian President in November, 2018.<\/p>\n<p>He explained that the road map would deliver 7,000MW in the first phase, and in the second phase, up to 11,000MW.<\/p>\n<p>He said, \u201cThat will significantly enhance the country\u2019s power supply and gets the country to the next industrial phase. We believe we will all very much benefit together, the people of Nigeria and of course Siemens as a company.<\/p>\n<p>\u201cI am very honoured that we were able to sign this road map today in the presence of the President and our partners. I will personally make sure that this will be a big success for Nigeria, Siemens and our partners in the country.\u201d<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Nigeria and electricity giant, Siemens, have signed a power deal that will lead to the production of 25,000 megawatts of electricity by 2025.<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":6,"featured_media":9810,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[23,1593,17,624],"tags":[160,4820],"coauthors":[2391],"class_list":["post-33443","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-business","category-metro","category-news","category-politics","tag-nigeria","tag-siemens"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal - National Wire<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal - National Wire\" \/>\n<meta property=\"og:description\" content=\"Nigeria and electricity giant, Siemens, have signed a power deal that will lead to the production of 25,000 megawatts of electricity by 2025.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/\" \/>\n<meta property=\"og:site_name\" content=\"National Wire\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-23T10:10:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/12\/electricity-industry-technology-power-power-line-1264705.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\n\t<meta property=\"og:image:height\" content=\"1021\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Friday Ekeoba\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/\",\"name\":\"National Wire\",\"description\":\"About Nigerians, Nigerian Business and Other Stories\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#primaryimage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/12\/electricity-industry-technology-power-power-line-1264705.jpg\",\"contentUrl\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/12\/electricity-industry-technology-power-power-line-1264705.jpg\",\"width\":1300,\"height\":1021},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#webpage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/\",\"name\":\"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal - National Wire\",\"isPartOf\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#primaryimage\"},\"datePublished\":\"2019-07-23T10:10:56+00:00\",\"dateModified\":\"2019-07-23T10:10:56+00:00\",\"author\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\"},\"breadcrumb\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nationalwire.com.ng\/sub\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\",\"name\":\"Friday Ekeoba\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal - National Wire","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/","og_locale":"en_US","og_type":"article","og_title":"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal - National Wire","og_description":"Nigeria and electricity giant, Siemens, have signed a power deal that will lead to the production of 25,000 megawatts of electricity by 2025.","og_url":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/","og_site_name":"National Wire","article_published_time":"2019-07-23T10:10:56+00:00","og_image":[{"width":1300,"height":1021,"url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/12\/electricity-industry-technology-power-power-line-1264705.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Friday Ekeoba","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/nationalwire.com.ng\/sub\/#website","url":"https:\/\/nationalwire.com.ng\/sub\/","name":"National Wire","description":"About Nigerians, Nigerian Business and Other Stories","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#primaryimage","url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/12\/electricity-industry-technology-power-power-line-1264705.jpg","contentUrl":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/12\/electricity-industry-technology-power-power-line-1264705.jpg","width":1300,"height":1021},{"@type":"WebPage","@id":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#webpage","url":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/","name":"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal - National Wire","isPartOf":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#primaryimage"},"datePublished":"2019-07-23T10:10:56+00:00","dateModified":"2019-07-23T10:10:56+00:00","author":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927"},"breadcrumb":{"@id":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/nationalwire.com.ng\/sub\/nigeria-siemens-sign-25000mw-six-year-electricity-deal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nationalwire.com.ng\/sub\/"},{"@type":"ListItem","position":2,"name":"Nigeria, Siemens Sign 25,000MW Six-Year Electricity Deal"}]},{"@type":"Person","@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927","name":"Friday Ekeoba","url":"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/"}]}},"_links":{"self":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/33443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/comments?post=33443"}],"version-history":[{"count":1,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/33443\/revisions"}],"predecessor-version":[{"id":33444,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/33443\/revisions\/33444"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media\/9810"}],"wp:attachment":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media?parent=33443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/categories?post=33443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/tags?post=33443"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/coauthors?post=33443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}