{"id":26068,"date":"2018-09-04T12:53:48","date_gmt":"2018-09-04T11:53:48","guid":{"rendered":"https:\/\/nationalwire.com.ng\/?p=26068"},"modified":"2018-09-04T12:53:48","modified_gmt":"2018-09-04T11:53:48","slug":"chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project","status":"publish","type":"post","link":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/","title":{"rendered":"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project"},"content":{"rendered":"<p>China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.<\/p>\n<p>The boost for the project was revealed during a high-level meeting between the Nigerian National Petroleum Corporation and CNPC\u2019s management held on the sidelines of the Forum on China-Africa Cooperation Summit in Beijing, China, according to a statement made available by the Group General Manager, Public Affairs Division, NNPC, Mr Ndu Ughamadu.<\/p>\n<p>According to the statement, the Chinese oil company assured the Group Managing Director of NNPC, Dr Maikanti Baru, of its unflinching commitment towards securing the funding for the successful financing and execution of the project.<\/p>\n<p>Financing for the 40-inch x 614km AKK gas pipeline is expected to cost about $2.8bn.<\/p><div data-ad-id=\"32665\" style=\"text-align:center; margin-top:0px; margin-bottom:0px; margin-left:0px; margin-right:0px;float:none;\" class=\"afw afw_ad_image afw_ad afwadid-32665  \">\r\n                                                            <div style=\"font-size:10px;text-align:center;color:#cccccc;\">Advertisement<\/div>\r\n\t\t\t\t\t\t\t<a target=\"_blank\" href=\"http:\/\/www.accessbankplc.com\" rel=\"nofollow\"><img decoding=\"async\" height=\"auto\" max-width=\"100%\" src=\"https:\/\/nationalwire.com.ng\/wp-content\/uploads\/2019\/06\/Banner-1.jpg\"><\/a>\r\n                                                                        \r\n\t\t\t\t\t\t\t<\/div>\n<p>While 85 per cent of the money is expected to be provided by the financiers, which include Industrial and Commercial Bank of China, Bank of China, and Infrastructure Bank of China with Sinosure, China\u2019s Export Credit Agency providing insurance cover, the remaining 15 per cent will be provided by the contractors, which include Oilserve\/Oando consortium, as well as Brentex\/China Petroleum Pipeline Bureau consortium.<\/p>\n<p><b><strong><em>Photo Caption: NNPC GMD BARU<\/em><\/strong><\/b><\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project. The boost for the project was revealed during a high-level meeting between the Nigerian National Petroleum Corporation and CNPC\u2019s management held on the sidelines of the Forum on China-Africa Cooperation Summit in Beijing, China, according &hellip;<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":6,"featured_media":26069,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[23,1593,17],"tags":[3179],"coauthors":[2391],"class_list":["post-26068","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-business","category-metro","category-news","tag-chinese"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project - National Wire<\/title>\n<meta name=\"description\" content=\"China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project - National Wire\" \/>\n<meta property=\"og:description\" content=\"China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/\" \/>\n<meta property=\"og:site_name\" content=\"National Wire\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-04T11:53:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/09\/BARU-GMD-NNPC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"589\" \/>\n\t<meta property=\"og:image:height\" content=\"688\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Friday Ekeoba\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/\",\"name\":\"National Wire\",\"description\":\"About Nigerians, Nigerian Business and Other Stories\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#primaryimage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/09\/BARU-GMD-NNPC.jpg\",\"contentUrl\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/09\/BARU-GMD-NNPC.jpg\",\"width\":589,\"height\":688},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#webpage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/\",\"name\":\"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project - National Wire\",\"isPartOf\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#primaryimage\"},\"datePublished\":\"2018-09-04T11:53:48+00:00\",\"dateModified\":\"2018-09-04T11:53:48+00:00\",\"author\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\"},\"description\":\"China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.\",\"breadcrumb\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nationalwire.com.ng\/sub\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\",\"name\":\"Friday Ekeoba\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project - National Wire","description":"China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/","og_locale":"en_US","og_type":"article","og_title":"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project - National Wire","og_description":"China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.","og_url":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/","og_site_name":"National Wire","article_published_time":"2018-09-04T11:53:48+00:00","og_image":[{"width":589,"height":688,"url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/09\/BARU-GMD-NNPC.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Friday Ekeoba","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/nationalwire.com.ng\/sub\/#website","url":"https:\/\/nationalwire.com.ng\/sub\/","name":"National Wire","description":"About Nigerians, Nigerian Business and Other Stories","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#primaryimage","url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/09\/BARU-GMD-NNPC.jpg","contentUrl":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/09\/BARU-GMD-NNPC.jpg","width":589,"height":688},{"@type":"WebPage","@id":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#webpage","url":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/","name":"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project - National Wire","isPartOf":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#primaryimage"},"datePublished":"2018-09-04T11:53:48+00:00","dateModified":"2018-09-04T11:53:48+00:00","author":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927"},"description":"China National Petroleum Corporation says that it will secure the financing required for the execution of the Ajaokuta-Kaduna-Kano pipeline project.","breadcrumb":{"@id":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/nationalwire.com.ng\/sub\/chinese-firm-to-secure-2-38-billion-for-ajaokuta-kano-pipeline-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nationalwire.com.ng\/sub\/"},{"@type":"ListItem","position":2,"name":"Chinese Firm To Secure $2.38 Billion For Ajaokuta-Kano Pipeline Project"}]},{"@type":"Person","@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927","name":"Friday Ekeoba","url":"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/"}]}},"_links":{"self":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/26068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/comments?post=26068"}],"version-history":[{"count":1,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/26068\/revisions"}],"predecessor-version":[{"id":26070,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/26068\/revisions\/26070"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media\/26069"}],"wp:attachment":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media?parent=26068"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/categories?post=26068"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/tags?post=26068"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/coauthors?post=26068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}