{"id":23573,"date":"2018-05-10T15:28:42","date_gmt":"2018-05-10T14:28:42","guid":{"rendered":"https:\/\/nationalwire.com.ng\/?p=23573"},"modified":"2018-05-10T15:28:42","modified_gmt":"2018-05-10T14:28:42","slug":"ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project","status":"publish","type":"post","link":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/","title":{"rendered":"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project"},"content":{"rendered":"<p>AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project.<\/p>\n<p>The four- kilometer road is divided into two kilometres on each bound carriageway.<\/p>\n<p>Each bound carriageway is further divided into four sections for ease of construction and traffic management.<\/p>\n<p>Correspondents who visited the site also observed workmen laying iron rods along Section four on both the Apapa and CMS\/Ijora bound carriageways.<\/p>\n<p>Also, earth moving equipment were carrying out excavations on a section of the Apapa bound carriageway which is part of the second phase of the project.<\/p>\n<p>A senior engineer who preferred anonymity told NAN that work had begun on Sections One and Four on phase two of the project.<\/p>\n<p>The engineer said that the first phase of the project which is the CMS \/Ijora bound carriageway was almost fully completed.<\/p><div data-ad-id=\"32665\" style=\"text-align:center; margin-top:0px; margin-bottom:0px; margin-left:0px; margin-right:0px;float:none;\" class=\"afw afw_ad_image afw_ad afwadid-32665  \">\r\n                                                            <div style=\"font-size:10px;text-align:center;color:#cccccc;\">Advertisement<\/div>\r\n\t\t\t\t\t\t\t<a target=\"_blank\" href=\"http:\/\/www.accessbankplc.com\" rel=\"nofollow\"><img decoding=\"async\" height=\"auto\" max-width=\"100%\" src=\"https:\/\/nationalwire.com.ng\/wp-content\/uploads\/2019\/06\/Banner-1.jpg\"><\/a>\r\n                                                                        \r\n\t\t\t\t\t\t\t<\/div>\n<p>\u201cWe have started work on the inbound section that is the Apapa bound carriageway. We are working on Sections One and Four of the inbound.<\/p>\n<p>\u201cThe Apapa bound carriageway is in the second phase of the project,\u2019\u2019 he said.<\/p>\n<p>Also, the Federal Controller of Works, Lagos, Mr Adedamola Kuti, confirmed to NAN that work on the first phase of Apapa-Wharf Road was almost completed and work had begun on the second phase.<\/p>\n<p>\u201cWe are working now on Section four.\u2019\u2019<\/p>\n<p>He said that the ministry had overcome the initial challenges of relocating services on the Right of Way (RoW) which had initially slowed down the project.<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management. Correspondents who visited the site also observed workmen &hellip;<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":6,"featured_media":23574,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1593,17],"tags":[4033],"coauthors":[2391],"class_list":["post-23573","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-metro","category-news","tag-ag-dangote"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project - National Wire<\/title>\n<meta name=\"description\" content=\"AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project - National Wire\" \/>\n<meta property=\"og:description\" content=\"AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/\" \/>\n<meta property=\"og:site_name\" content=\"National Wire\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-10T14:28:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/05\/AG-Dangote-448x336.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"448\" \/>\n\t<meta property=\"og:image:height\" content=\"336\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Friday Ekeoba\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/\",\"name\":\"National Wire\",\"description\":\"About Nigerians, Nigerian Business and Other Stories\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#primaryimage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/05\/AG-Dangote-448x336.jpg\",\"contentUrl\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/05\/AG-Dangote-448x336.jpg\",\"width\":448,\"height\":336,\"caption\":\"AG DANGOTE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#webpage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/\",\"name\":\"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project - National Wire\",\"isPartOf\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#primaryimage\"},\"datePublished\":\"2018-05-10T14:28:42+00:00\",\"dateModified\":\"2018-05-10T14:28:42+00:00\",\"author\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\"},\"description\":\"AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management.\",\"breadcrumb\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nationalwire.com.ng\/sub\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\",\"name\":\"Friday Ekeoba\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project - National Wire","description":"AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/","og_locale":"en_US","og_type":"article","og_title":"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project - National Wire","og_description":"AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management.","og_url":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/","og_site_name":"National Wire","article_published_time":"2018-05-10T14:28:42+00:00","og_image":[{"width":448,"height":336,"url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/05\/AG-Dangote-448x336.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Friday Ekeoba","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/nationalwire.com.ng\/sub\/#website","url":"https:\/\/nationalwire.com.ng\/sub\/","name":"National Wire","description":"About Nigerians, Nigerian Business and Other Stories","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#primaryimage","url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/05\/AG-Dangote-448x336.jpg","contentUrl":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2018\/05\/AG-Dangote-448x336.jpg","width":448,"height":336,"caption":"AG DANGOTE"},{"@type":"WebPage","@id":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#webpage","url":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/","name":"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project - National Wire","isPartOf":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#primaryimage"},"datePublished":"2018-05-10T14:28:42+00:00","dateModified":"2018-05-10T14:28:42+00:00","author":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927"},"description":"AG Dangote Construction Company Limited has begun work on the second phase of the Apapa\/Wharf Road reconstruction project. The four- kilometer road is divided into two kilometres on each bound carriageway. Each bound carriageway is further divided into four sections for ease of construction and traffic management.","breadcrumb":{"@id":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/nationalwire.com.ng\/sub\/ag-dangote-begins-reconstruction-of-second-phase-of-apapa-wharf-road-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nationalwire.com.ng\/sub\/"},{"@type":"ListItem","position":2,"name":"AG Dangote Begins Reconstruction Of Second Phase Of Apapa\/Wharf Road Project"}]},{"@type":"Person","@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927","name":"Friday Ekeoba","url":"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/"}]}},"_links":{"self":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/23573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/comments?post=23573"}],"version-history":[{"count":1,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/23573\/revisions"}],"predecessor-version":[{"id":23575,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/23573\/revisions\/23575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media\/23574"}],"wp:attachment":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media?parent=23573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/categories?post=23573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/tags?post=23573"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/coauthors?post=23573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}