{"id":21886,"date":"2018-03-02T14:56:25","date_gmt":"2018-03-02T13:56:25","guid":{"rendered":"https:\/\/nationalwire.com.ng\/?p=21886"},"modified":"2018-03-02T14:56:25","modified_gmt":"2018-03-02T13:56:25","slug":"fg-complete-n537m-osun-bridge","status":"publish","type":"post","link":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/","title":{"rendered":"FG To Complete N537m Osun Bridge"},"content":{"rendered":"<p>The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun.<\/p>\n<p>The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.<\/p>\n<p>Represented by Mr Adetunji Adeoye, the South-West Director of the ministry, Fashola said that he was impressed with the level of work done at the site.<\/p>\n<p>The minister, who noted that the contract was awarded in April 2017, said the contractor had been paid N137m out of the total contract sum.<\/p><div data-ad-id=\"32665\" style=\"text-align:center; margin-top:0px; margin-bottom:0px; margin-left:0px; margin-right:0px;float:none;\" class=\"afw afw_ad_image afw_ad afwadid-32665  \">\r\n                                                            <div style=\"font-size:10px;text-align:center;color:#cccccc;\">Advertisement<\/div>\r\n\t\t\t\t\t\t\t<a target=\"_blank\" href=\"http:\/\/www.accessbankplc.com\" rel=\"nofollow\"><img decoding=\"async\" height=\"auto\" max-width=\"100%\" src=\"https:\/\/nationalwire.com.ng\/wp-content\/uploads\/2019\/06\/Banner-1.jpg\"><\/a>\r\n                                                                        \r\n\t\t\t\t\t\t\t<\/div>\n<p>Fashola also said that government was committed to ensuring that all the ongoing projects in the state and other parts of the country were completed on schedule.<\/p>\n<p>Also speaking, Mr. Wasiu Atitebi, the Federal Controller of Works in the state, told newsmen that the contract was awarded and to be completed in 12 months.<\/p>\n<p>Atitebi said the project was already 50 per cent completed, adding that government did not owe the contractor.<br \/>\nMr Humphrey Eihebholo, the representative of Preconsmith Construction Company handling the project, confirmed that government did not owe the firm.<br \/>\n<em>(NAN)<\/em><\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state. Represented by Mr Adetunji Adeoye, the South-West Director &hellip;<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":6,"featured_media":9065,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[23,17],"tags":[1432],"coauthors":[2391],"class_list":["post-21886","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-business","category-news","tag-bridges"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>FG To Complete N537m Osun Bridge - National Wire<\/title>\n<meta name=\"description\" content=\"The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FG To Complete N537m Osun Bridge - National Wire\" \/>\n<meta property=\"og:description\" content=\"The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/\" \/>\n<meta property=\"og:site_name\" content=\"National Wire\" \/>\n<meta property=\"article:published_time\" content=\"2018-03-02T13:56:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/10\/Rauf.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"225\" \/>\n\t<meta property=\"og:image:height\" content=\"225\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Friday Ekeoba\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/\",\"name\":\"National Wire\",\"description\":\"About Nigerians, Nigerian Business and Other Stories\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#primaryimage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/10\/Rauf.jpg\",\"contentUrl\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/10\/Rauf.jpg\",\"width\":225,\"height\":225,\"caption\":\"Gov. Rauf Aregbesola of Osun State\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#webpage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/\",\"name\":\"FG To Complete N537m Osun Bridge - National Wire\",\"isPartOf\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#primaryimage\"},\"datePublished\":\"2018-03-02T13:56:25+00:00\",\"dateModified\":\"2018-03-02T13:56:25+00:00\",\"author\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\"},\"description\":\"The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.\",\"breadcrumb\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nationalwire.com.ng\/sub\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FG To Complete N537m Osun Bridge\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927\",\"name\":\"Friday Ekeoba\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FG To Complete N537m Osun Bridge - National Wire","description":"The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/","og_locale":"en_US","og_type":"article","og_title":"FG To Complete N537m Osun Bridge - National Wire","og_description":"The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.","og_url":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/","og_site_name":"National Wire","article_published_time":"2018-03-02T13:56:25+00:00","og_image":[{"width":225,"height":225,"url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/10\/Rauf.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Friday Ekeoba","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/nationalwire.com.ng\/sub\/#website","url":"https:\/\/nationalwire.com.ng\/sub\/","name":"National Wire","description":"About Nigerians, Nigerian Business and Other Stories","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#primaryimage","url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/10\/Rauf.jpg","contentUrl":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2016\/10\/Rauf.jpg","width":225,"height":225,"caption":"Gov. Rauf Aregbesola of Osun State"},{"@type":"WebPage","@id":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#webpage","url":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/","name":"FG To Complete N537m Osun Bridge - National Wire","isPartOf":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#primaryimage"},"datePublished":"2018-03-02T13:56:25+00:00","dateModified":"2018-03-02T13:56:25+00:00","author":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927"},"description":"The Federal Government on Friday gave an assurance that it would complete the ongoing N537m Ojutu bridge in Ilobu, Osun. The Minister of Works, Power and Housing, Mr Babatunde Fashola, said this while assessing the level of work on some ongoing Federal Government projects in the state.","breadcrumb":{"@id":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/nationalwire.com.ng\/sub\/fg-complete-n537m-osun-bridge\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nationalwire.com.ng\/sub\/"},{"@type":"ListItem","position":2,"name":"FG To Complete N537m Osun Bridge"}]},{"@type":"Person","@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/e2ab303e561d755b325fc9cea3854927","name":"Friday Ekeoba","url":"https:\/\/nationalwire.com.ng\/sub\/author\/friday\/"}]}},"_links":{"self":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/21886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/comments?post=21886"}],"version-history":[{"count":1,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/21886\/revisions"}],"predecessor-version":[{"id":21887,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/21886\/revisions\/21887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media\/9065"}],"wp:attachment":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media?parent=21886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/categories?post=21886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/tags?post=21886"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/coauthors?post=21886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}