{"id":12136,"date":"2017-04-06T14:31:24","date_gmt":"2017-04-06T13:31:24","guid":{"rendered":"https:\/\/nationalwire.com.ng\/?p=12136"},"modified":"2017-04-06T14:31:24","modified_gmt":"2017-04-06T13:31:24","slug":"apapa-marine-beach-bridge-to-be-closed-for-29-days","status":"publish","type":"post","link":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/","title":{"rendered":"Apapa Marine Beach Bridge to be closed for 29 days"},"content":{"rendered":"<p>The Apapa-bound carriageway of the Apapa Marine Beach Bridge will be closed on Friday for 29 days in its ongoing rehabilitation, the site Manager, Mr Simon Barakat, has said.<\/p>\n<p>Barakat, who spoke on site on Thursday, appealed to road users to be patient and use alternative routes.<\/p>\n<p>\u201cWe will close the Apapa-bound carriageway on Friday evening, and it will remain closed up till May 8.<\/p>\n<p>\u201cWe appeal to road users to slow down in this area and be more careful to use the diversions and respect traffic signs to check gridlock.<\/p>\n<p>\u201cTruck owners should avoid breakdowns within this period by maintaining their vehicles regularly,\u2019\u2019 he said.<\/p>\n<p>Barakat, a Senior Engineer with Buildwell Plants and Equipment Industries Ltd., the contractors handling the project, said that two major diversions had been created to avert gridlock.<\/p>\n<p>The manager said that the repair done on the Ijora\/Lagos-bound carriageway was being replicated on the Apapa-bound carriageway, adding that foundation works under the bridge had been completed.<\/p>\n<p>\u201cWe are marking, cutting and doing the preparation to start post-tensioning of the bridge; this gives strength to the bridge.<\/p>\n<p>\u201cWe have to demolish the bridge to fix the cables and cast concrete on it again to prepare it for the next stage of construction which will be the installation of bearings,\u2019\u2019 he said.<\/p>\n<p>He said that after the 29 days, the next stage of repairs would be the replacement of bearings on both carriageways which, he said, would take 40 days on each side.<\/p><div data-ad-id=\"32665\" style=\"text-align:center; margin-top:0px; margin-bottom:0px; margin-left:0px; margin-right:0px;float:none;\" class=\"afw afw_ad_image afw_ad afwadid-32665  \">\r\n                                                            <div style=\"font-size:10px;text-align:center;color:#cccccc;\">Advertisement<\/div>\r\n\t\t\t\t\t\t\t<a target=\"_blank\" href=\"http:\/\/www.accessbankplc.com\" rel=\"nofollow\"><img decoding=\"async\" height=\"auto\" max-width=\"100%\" src=\"https:\/\/nationalwire.com.ng\/wp-content\/uploads\/2019\/06\/Banner-1.jpg\"><\/a>\r\n                                                                        \r\n\t\t\t\t\t\t\t<\/div>\n<p>Mrs Bola Suleiman of the Federal Ministry of Power, Works and Housing, an engineer supervising the project, said that all the traffic management agencies had been mobilised to ensure free flow of traffic during the closure.<\/p>\n<p>\u201cThe traffic management agencies are all aware; we made the decision together at our stakeholders\u2019 meeting; they will divert traffic coming to Apapa through Ajegunle and Mobil Road,\u2019\u2019 she said.<\/p>\n<p>Suleiman said that the ministry was filling potholes on Burma Road to ease traffic.<\/p>\n<p>The Marine Beach Bridge was damaged by fire about 10 years ago.<\/p>\n<p>The contract for repair of the bridge was awarded in 2012, but the contractor abandoned the project due to funds constraint.<\/p>\n<p>The contractor moved back to site on March 5 to begin the repair works.<\/p>\n<p>The Ijora\/Lagos-bound carriageway was opened to light traffic on March 26 after the first phase of work was done on the carriageway.<\/p>\n<p>(NAN)<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>The Apapa-bound carriageway of the Apapa Marine Beach Bridge will be closed on Friday for 29 days in its ongoing rehabilitation, the site Manager, Mr Simon Barakat, has said. Barakat, who spoke on site on Thursday, appealed to road users to be patient and use alternative routes. \u201cWe will close the Apapa-bound carriageway on Friday &hellip;<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":11,"featured_media":12137,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[17],"tags":[849],"coauthors":[2392,2393],"class_list":["post-12136","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news","tag-apapa"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Apapa Marine Beach Bridge to be closed for 29 days - National Wire<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Apapa Marine Beach Bridge to be closed for 29 days - National Wire\" \/>\n<meta property=\"og:description\" content=\"The Apapa-bound carriageway of the Apapa Marine Beach Bridge will be closed on Friday for 29 days in its ongoing rehabilitation, the site Manager, Mr Simon Barakat, has said. Barakat, who spoke on site on Thursday, appealed to road users to be patient and use alternative routes. \u201cWe will close the Apapa-bound carriageway on Friday &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/\" \/>\n<meta property=\"og:site_name\" content=\"National Wire\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-06T13:31:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2017\/04\/APAPA-IJORA-BRIDGE-ONE.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"360\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dayo Emmanuel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/\",\"name\":\"National Wire\",\"description\":\"About Nigerians, Nigerian Business and Other Stories\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#primaryimage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2017\/04\/APAPA-IJORA-BRIDGE-ONE.jpg\",\"contentUrl\":\"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2017\/04\/APAPA-IJORA-BRIDGE-ONE.jpg\",\"width\":360,\"height\":480},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#webpage\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/\",\"name\":\"Apapa Marine Beach Bridge to be closed for 29 days - National Wire\",\"isPartOf\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#primaryimage\"},\"datePublished\":\"2017-04-06T13:31:24+00:00\",\"dateModified\":\"2017-04-06T13:31:24+00:00\",\"author\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/806673c5851717dc3067b1a46a6c060f\"},\"breadcrumb\":{\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nationalwire.com.ng\/sub\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Apapa Marine Beach Bridge to be closed for 29 days\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/806673c5851717dc3067b1a46a6c060f\",\"name\":\"Dayo Emmanuel\",\"url\":\"https:\/\/nationalwire.com.ng\/sub\/author\/dayo\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Apapa Marine Beach Bridge to be closed for 29 days - National Wire","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/","og_locale":"en_US","og_type":"article","og_title":"Apapa Marine Beach Bridge to be closed for 29 days - National Wire","og_description":"The Apapa-bound carriageway of the Apapa Marine Beach Bridge will be closed on Friday for 29 days in its ongoing rehabilitation, the site Manager, Mr Simon Barakat, has said. Barakat, who spoke on site on Thursday, appealed to road users to be patient and use alternative routes. \u201cWe will close the Apapa-bound carriageway on Friday &hellip;","og_url":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/","og_site_name":"National Wire","article_published_time":"2017-04-06T13:31:24+00:00","og_image":[{"width":360,"height":480,"url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2017\/04\/APAPA-IJORA-BRIDGE-ONE.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dayo Emmanuel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/nationalwire.com.ng\/sub\/#website","url":"https:\/\/nationalwire.com.ng\/sub\/","name":"National Wire","description":"About Nigerians, Nigerian Business and Other Stories","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationalwire.com.ng\/sub\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#primaryimage","url":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2017\/04\/APAPA-IJORA-BRIDGE-ONE.jpg","contentUrl":"https:\/\/nationalwire.com.ng\/sub\/wp-content\/uploads\/2017\/04\/APAPA-IJORA-BRIDGE-ONE.jpg","width":360,"height":480},{"@type":"WebPage","@id":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#webpage","url":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/","name":"Apapa Marine Beach Bridge to be closed for 29 days - National Wire","isPartOf":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#primaryimage"},"datePublished":"2017-04-06T13:31:24+00:00","dateModified":"2017-04-06T13:31:24+00:00","author":{"@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/806673c5851717dc3067b1a46a6c060f"},"breadcrumb":{"@id":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/nationalwire.com.ng\/sub\/apapa-marine-beach-bridge-to-be-closed-for-29-days\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nationalwire.com.ng\/sub\/"},{"@type":"ListItem","position":2,"name":"Apapa Marine Beach Bridge to be closed for 29 days"}]},{"@type":"Person","@id":"https:\/\/nationalwire.com.ng\/sub\/#\/schema\/person\/806673c5851717dc3067b1a46a6c060f","name":"Dayo Emmanuel","url":"https:\/\/nationalwire.com.ng\/sub\/author\/dayo\/"}]}},"_links":{"self":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/12136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/comments?post=12136"}],"version-history":[{"count":1,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/12136\/revisions"}],"predecessor-version":[{"id":12138,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/posts\/12136\/revisions\/12138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media\/12137"}],"wp:attachment":[{"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/media?parent=12136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/categories?post=12136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/tags?post=12136"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/nationalwire.com.ng\/sub\/wp-json\/wp\/v2\/coauthors?post=12136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}